Savannah Harbor Dredging – Savannah, GA

W912HN-19-C-5004

BRIEF DESCRIPTION

The project includes removal of all material, including any material within the existing maintenance prism, to required project depths and overdepths. Dredging of maintenance and unclassified material between Stations 70+000 to 103+000 and Kings Island Turning Basin, debris removal, and diving shall be included in the contract. All dredged material will be disposed of in existing confined upland disposal

AT A GLANCE

TITAN Role Site Safety & Health Officer (SSHO)
Client Norfolk Dredging
Contract Price $133,162,809