Repair Mechanical Systems – Anderson AFB, GU

75P00118C00037

BRIEF DESCRIPTION

The PWS is to provide altered guidance from the current template as relates to the design and room content lay-in required for this specific project. Specifically, the actual room areas will be less than that called for within the template and the renovation will be to the extent possible in the areas as provided in the attached floor plan (attachment room sizes are approximate and shall not to be considered exact for the purpose of room sizing).

TITAN provided QC Management to the project.

QC MANAGER SCOPE OF WORK

  • Procedures for tracking preparatory, initial, and follow-up control phases; control, verification, and acceptance tests including documentation
  • Coordination of project logistics, materials and equipment
  • Managing the day-to-day quality control activities
  • Kept designated personnel and management staff apprised of status of work
  • Ensured all reports were prepared and submitted in accordance with the QC Plan, including the Daily Quality Control Reports
  • Maintained all the project quality control files
  • Reported and logged any work not meeting Spec requirements
  • Recorded all data in QCS database

AT A GLANCE

Project Type Government
TITAN Role Quality Control (QC) Manager
Client Specpro Environmental
Contract Price $5.250,000