KSC DREDGING – TITUSVILLE, FL

KSC DREDGING TITUSVILLE, FL NNK17CA10C BRIEF DESCRIPTION   Banana River Channel Maintenance Dredging Project Project Overview The Banana River Channel Maintenance Dredging project involved the removal of approximately 200,000 cubic yards of material from a two-mile-long, 125-foot-wide section of the Banana River channel. The objective was to restore the channel depth to -13.0 feet Mean […]

LAKE MONTAUK – MONTAUK, NY

LAKE MONTAUK MONTAUK, NY W912DS-18-C-0013 BRIEF DESCRIPTION Lake Montauk Harbor Maintenance Dredging Project Project Overview The Lake Montauk Harbor Maintenance Dredging project involved removing up to approximately 45,000 cubic yards of sand from the harbor’s channel and deposition basin. The dredged material, consisting of over 90% sand, was placed along the adjacent beach just west […]

MAINTENANCE DREDGING – LONG ISLAND, NY

MAINTENANCE DREDGING LONG ISLAND, NY BRIEF DESCRIPTION Long Island Intracoastal Waterway Maintenance Dredging Project at Moriches Bay Project Overview The New York District of the U.S. Army Corps of Engineers (USACE) commissioned the maintenance dredging of the Long Island Intracoastal Waterway (LIIW) Federal Navigation Project at Moriches Bay. This project involved removing up to approximately […]

KNAPPS NARROWS – TALBOT COUNTY – MD

KNAPPS NARROWS TALBOT COUNTY – MD W912DR-18-C-0007 BRIEF DESCRIPTION Knapps Narrows Federal Navigation Channel Maintenance Dredging Project Project Overview The U.S. Army Corps of Engineers (USACE) Baltimore District commissioned the maintenance dredging of the Knapps Narrows Federal Navigation Channel near Tilghman Island. This crucial project involved the removal of 100,000 cubic yards (CY) of material […]

UPPER REACH B – PHILADELPHIA, PA

UPPER REACH B PHILADELPHIA, PA W912BU-19-C-0066 BRIEF DESCRIPTION   Delaware River Main Channel Deepening Project Project Overview The Delaware River Main Channel Deepening project involves dredging approximately 4 million cubic yards of material from various portions of the Tinicum, Eddystone, Chester, Marcus Hook, and Bellevue Ranges of the Delaware River main channel. This extensive dredging […]

ELBOW CREEK DREDGING – MELBOURNE, FL

ELBOW CREEK DREDGING MELBOURNE, FL BRIEF DESCRIPTION Restoration Dredging Project with Environmental Considerations Project Overview The restoration dredging project involves the dredging, dewatering, and disposing of dredged material with a strong focus on environmental considerations, including manatee protection and turbidity testing. The project includes running over 3 miles of pipeline through various locations, necessitating borings […]

DELAWARE RIVER MAINTENANCE PROJECT

DELAWARE RIVER MAINTENANCE PROJECT Play Previous Next BRIEF DESCRIPTION Delaware River Dredging Project Project Overview The Delaware River Dredging Project involved removing 127,000 cubic yards (c.y.) of soft sandy material from a portion of the Delaware River, stretching between Philadelphia, PA, and Trenton, NJ. This project was essential for maintaining navigability and ensuring safe passage […]

MAINTENANCE DREDGING SACO RIVER – SACO, ME

MAINTENANCE DREDGING SACO RIVER SACO, ME W912WJ-18-C-0037 Previous slide Next slide BRIEF DESCRIPTION Saco River Federal Navigation Project Project Overview The Saco River Federal Navigation Project involves dredging a portion of the federal navigation channel near the entrance of the Saco River. The project’s primary goal is to maintain and improve vessel navigability by removing […]

MAINTENANCE DREDGING AIWW – JACKSONVILLE, FL

38 & 40-FOOT DREDGING JACKSONVILLE, FL W912EP-18-C-0012 BRIEF DESCRIPTION Bar Cut Maintenance Dredging Project Project Overview The Bar Cut Maintenance Dredging Project involves dredging at various locations from Bar Cut-3 through Cut-9 to maintain navigability and safety. The dredging work aims to restore the channel depth to 40 feet, with an allowable 2-foot over depth […]

MAINTENANCE DREDGING AIWW – WILMINGTON, NC

MAINTENANCE DREDGING AIWW WILMINGTON, NC W912PM-16-C-0014 BRIEF DESCRIPTION Project consists of the removal and disposal of shoaled material that has accumulated in the channels since the various areas were last dredged. The dredging was performed by hydraulic cutter suction dredge. Dredging depth is 12′ plus 2′ of allowable overdepth for the AIWW and 9′ plus […]