Pickwick Dam – Counce, TN

W912P5-17-C-0010

BRIEF DESCRIPTION

The work of this USACE project involved both Demolition and Construction. One Mooring Cell at Pickwick Lock and Dam was replaced. Demolition of the cell required removal and storage of the aggregate, and removal of sheet piles. Existing sheet piles have were removed.

The new cell is 30.5 ft diameter by 60 ft height in the same footprint as the old.

TITAN provided a Site Safety and Health Officer as well as Preconstruction Plans on this project.

SSHO SCOPE OF WORK

  • Maintained MSDS to ensure no hazardous items were brought onto jobsite
  • Enforced USACE EM 385-1-1 and held the project to OSHA standards
  • Maintained MSDS to ensure no hazardous items were brought onto jobsite
  • Managed all phases of safety control
  • Conducted daily safety inspections
  • Conducted daily safety briefings and weekly toolbox talks
  • Kept list of deficient safety items and maintained list until all safety deficiencies were addressed
  • Coordinated with USACE QA on site all safety items
  • Ensured public safety with additional warning signs and barriers
  • Maintained OSHA 300 Form and Daily Production reports
  • Kept photo logs of all safety issues
  • Attended pre-construction conference, pre-work meetings including preparatory inspection meeting, and periodic in-progress meetings
  • Enforced accepted APPS and AHAs
  • Spoke to local businesses and discussed safety issues with their patrons with our current operations

AT A GLANCE

Project Type Government
TITAN Role Site Safety & Health Officer (SSHO) & Quality Control (QC) Manager
Client Southern Marine Construction Co.
Completion Date April 2018
Contract Value $469.7k