Lake Montauk – Montauk, NY

W912DS-18-C-0013

BRIEF DESCRIPTION

Sand was dredged from the channel and deposition basin and subsequently placed along the adjacent beach just west of the west jetty. Maintenance dredging removed up to approximately 45,000 cubic yards of sand from Lake Montauk Harbor. Dredging was required to a depth of -14 feet Mean Lower Low Water plus 2 feet of allowable over depth. The dredged material is greater than 90% sand.

Lake Montauk Harbor is located on the south fork of eastern Long Island, Suffolk County, NY. The harbor opens to the north into Block Island Sound through an inlet stabilized by two jetties.

TITAN Provided a Site Safety and Health Officer

QUALITY CONTROL MANAGER SCOPE OF WORK

  • Procedures for tracking preparatory, initial, and follow-up control phases; control, verification, and acceptance tests including documentation
  • Coordination of project logistics, materials and equipment
  • Managing the day-to-day quality control activities
  • Kept designated personnel and management staff apprised of status of work
  • Ensured all reports were prepared and submitted in accordance with the QC Plan, including the Daily Quality Control Reports
  • Maintained all the project quality control files
  • Reported and logged any work not meeting Spec requirements
  • Recorded all data in QCS database

AT A GLANCE

Project Type Government
TITAN Role Quality Control (QC) Manager
Client H & L Contracting
Completion Date November 2018
Contract Value $776,533