Harbor Dredging – Montauk, NY

W912DS-18-C-0013

BRIEF DESCRIPTION

Project called for maintenance dredging of Lake Montauk Harbor, New York, Federal Navigation Project.

Sand was dredged from the channel and deposition basin and placed along the adjacent beach to the west of the west jetty.

Approximately 45,000 cubic yards of sand was removed from Lake Montauk Harbor. Dredging was required to a depth of -14 feet Mean Lower Low Water plus 2 feet of allowable over depth.

TITAN provided Site Safety and Health Officers on this project.

SSHO SCOPE OF WORK

  • Maintained MSDS to ensure no hazardous items were brought onto jobsite
  • Enforced USACE EM 385-1-1 and held the project to OSHA standards
  • Maintained MSDS to ensure no hazardous items were brought onto jobsite
  • Managed all phases of safety control
  • Conducted daily safety inspections
  • Conducted daily safety briefings and weekly toolbox talks
  • Kept list of deficient safety items and maintained list until all safety deficiencies were addressed
  • Coordinated with USACE QA on site all safety items
  • Ensured public safety with additional warning signs and barriers
  • Maintained OSHA 300 Form and Daily Production reports
  • Kept photo logs of all safety issues
  • Attended pre-construction conference, pre-work meetings including preparatory inspection meeting, and periodic in-progress meetings
  • Enforced accepted APPS and AHAs
  • Spoke to local businesses and discussed safety issues with their patrons with our current operations

AT A GLANCE

Project Type Government
TITAN Role Site Safety & Health Officer (SSHO)
Client H & L Contracting
Completion Date October 2018
Contract Value $776,553