JC Area 45 Transformer – Everett, WA

N4425513D8014-0002

BRIEF DESCRIPTION

Replace Area 45 Transformers: Remove the existing 2.5MVA transformer banks (2), voltage regulators, and associated buswork and replace with new transformers. Also conduct concrete repairs on the existing tower footings in area 45. The work includes in part, items such as: demolition, transformer foundations, concrete repairs and electrical and control wiring.

TITAN Provided the Project Quality Control Manager

QC MANAGER SCOPE OF WORK

  • Procedures for tracking preparatory, initial, and follow-up control phases; control, verification, and acceptance tests including documentation
  • Coordination of project logistics, materials and equipment
  • Managing the day-to-day quality control activities
  • Kept designated personnel and management staff apprised of status of work
  • Ensured all reports were prepared and submitted in accordance with the QC Plan, including the Daily Quality Control Reports
  • Maintained all the project quality control files
  • Reported and logged any work not meeting Spec requirements
  • Recorded all data in QCS database

AT A GLANCE

Project Type Government-NAVFAC
TITAN Role Quality Control (QC) Manager
Client Halbert Construction
Completion Date December 2018