38 & 40-Foot Dredging – Jacksonville, FL

W912EP-18-C-0012

BRIEF DESCRIPTION

This project consists of maintenance dredging at various locations from Bar Cut-3 through Cut-9 to a depth of 40 feet plus an allowable 2-foot overdepth. Material resulting from this work will be placed in Upland Disposal Area Bartram Island Cell A. Incidental work includes endangered species and turbidity monitoring.

TITAN provided the Site Safety & Health Officer to the project.

SSHO SCOPE OF WORK

  • Maintained MSDS to ensure no hazardous items were brought onto jobsite
  • Enforced USACE EM 385-1-1 and held the project to OSHA standards
  • Maintained MSDS to ensure no hazardous items were brought onto jobsite
  • Managed all phases of safety control
  • Conducted daily safety inspections
  • Conducted daily safety briefings and weekly toolbox talks
  • Kept list of deficient safety items and maintained list until all safety deficiencies were addressed
  • Coordinated with USACE QA on site all safety items
  • Ensured public safety with additional warning signs and barriers
  • Maintained OSHA 300 Form and Daily Production reports
  • Kept photo logs of all safety issues
  • Attended pre-construction conference, pre-work meetings including preparatory inspection meeting, and periodic in-progress meetings
  • Enforced accepted APPS and AHAs
  • Spoke to local businesses and discussed safety issues with their patrons with our current operations

AT A GLANCE

Project Type Government
TITAN Role Site Safety & Health Officer (SSHO)
Client Cashman Dredging and Marine
Completion Date January 2017
Contract Price $2.8M