Storm Damager Reduction – Brevard Co., FL

W912EP-16-R-0025

BRIEF DESCRIPTION

This U.S. Army Corps of Engineers project was to construct artificial mitigation reef mats at ten sites from Satellite Beach to Indialantic in Brevard County.

The low-lying reefs are concrete mats topped with coquina limestone. The plan was to construct ten reef sites to be placed in 15-Ft of water approximately 1,000 feet from shore.

TITAN provided SSHO & Quality Control Services to the project.

AT A GLANCE

Project Type Government
TITAN Role SSHO and Quality Control Manager
Client Shoreline Foundation
Contract Price $10.6M

SSHO SCOPE OF WORK

  • Maintained MSDS to ensure no hazardous items were brought onto jobsite
  • Enforced USACE EM 385-1-1 and held the project to OSHA standards
  • Maintained MSDS to ensure no hazardous items were brought onto jobsite
  • Managed all phases of safety control
  • Conducted daily safety inspections
  • Conducted daily safety briefings and weekly toolbox talks
  • Kept list of deficient safety items and maintained list until all safety deficiencies were addressed
  • Coordinated with Government QA onsite for all safety items
  • Ensured public safety with additional warning signs and barriers
  • Maintained OSHA 300 Form and Daily Production reports
  • Kept photo logs of all safety issues
  • Attended pre-construction conference, pre-work meetings including preparatory inspection meeting, and periodic in-progress meetings
  • Enforced accepted APPS and AHAs
  • Spoke to local businesses and discussed safety issues with their patrons with our current operations

QUALITY CONTROL MANAGER SCOPE OF WORK

  • Procedures for tracking preparatory, initial, and follow-up control phases; control, verification, and acceptance tests including documentation
  • Coordination of project logistics, materials and equipment
  • Managing the day-to-day quality control activities
  • Managed all phases of safety control
  • Kept designated personnel and management staff apprised of status of work
  • Ensured all reports were prepared and submitted in accordance with the QC Plan, including the Daily Quality Control Reports
  • Kept list of deficient safety items and maintained list until all safety deficiencies were addressed
  • Maintained all the project quality control files
  • Reported and logged any work not meeting Spec requirements
  • Maintained OSHA 300 Form and Daily Production reports