Peck Beach Dredging – Ocean City, NJ

W912BU-19-C-0063

BRIEF DESCRIPTION

This project was an upgrade to the current VA Hospital’s central chilled-water plant. The current existing cooling tower cells were degraded to the point they posed risk to facility operations as cooling for the hospital relied on the reliability of the failing equipment. Existing cooling towers serving the plant were refurbished as the Engineer of Record believed it would be less expensive than replacing them with all new equipment.

TITAN provided a Superintendent to the project.

AT A GLANCE

Project Type Government
TITAN Role Superintendent
Client Greenland Enterprises
Completion Date April 2018

QC MANAGER SCOPE OF WORK

  • Procedures for tracking preparatory, initial, and follow-up control phases; control, verification, and acceptance tests including documentation
  • Coordination of project logistics, materials and equipment
  • Managing the day-to-day quality control activities
  • Kept designated personnel and management staff apprised of status of work
  • Ensured all reports were prepared and submitted in accordance with the QC Plan, including the Daily Quality Control Reports
  • Maintained all the project quality control files
  • Reported and logged any work not meeting Spec requirements
  • Recorded all data in QCS database