Entrance Channel Dredging, Savannah, GA

W912HN-11-D-0006

BRIEF DESCRIPTION

On August 15, Great Lakes Dock and Dredge Company began work in South Carolina on the Myrtle Beach Storm Damage Reduction Project. Under a $34.8 million contract from the U. S. Army Corps of Engineers Charleston District, approximately 1.4 million cubic yards of material will be placed on Myrtle, North Myrtle, Garden City and Surfside Beaches covering a total of nearly 14 miles or shoreline.

The sand is being dredged by trailing suction hopper dredges Padre Island

and Dodge Island, both 281-feet, with hopper capacities of 3,600 cubic yards each. Once full, the dredges move and connect to a submerged pipeline that runs just up onto the beach, where it connects to a shore pipeline for final placement.

This storm damage reduction project goes along with the regularly scheduled plan for this area, which is to place sand on the beach every eight years. Last year, North Myrtle, Garden City and Surfside Beaches received 1.3 million cubic yards of sand using emergency funding made available after impacts from Hurricane Matthew. The three-phase project is being paid under federal emergency beach rehabilitation funding with additional money provided by Congress and local governments.

TITAN Provided Quality Control Manager

QC MANAGER SCOPE OF WORK

  • Procedures for tracking preparatory, initial, and follow-up control phases; control, verification, and acceptance tests including documentation
  • Coordination of project logistics, materials and equipment
  • Managing the day-to-day quality control activities
  • Kept designated personnel and management staff apprised of status of work
  • Ensured all reports were prepared and submitted in accordance with the QC Plan, including the Daily Quality Control Reports
  • Maintained all the project quality control files
  • Reported and logged any work not meeting Spec requirements
  • Recorded all data in QCS database

AT A GLANCE

Project Type Government-USACE
TITAN Role Quality Control (QC) Manager
Client Great Lakes Dredge & Dock
Completion Date January 2019
Contract Value $34.8M