DELAWARE RIVER MAINTENANCE PROJECT

Play Video

BRIEF DESCRIPTION

This project involves removing 127,000 c.y of soft sandy material along a portion of the Delaware River between Philadelphia, PA to Trenton, NJ. Logistics consisted of removing the material with a clamshell dredge, transporting the material down river, and unloading the material at a nearby unloading site.

TITAN provided QC Management Services to the project.

QC MANAGER SCOPE OF WORK

  • Procedures for tracking preparatory, initial, and follow-up control phases; control, verification, and acceptance tests including documentation
  • Coordination of project logistics, materials and equipment
  • Managing the day-to-day quality control activities
  • Kept designated personnel and management staff apprised of status of work
  • Ensured all reports were prepared and submitted in accordance with the QC Plan, including the Daily Quality Control Reports
  • Maintained all the project quality control files
  • Reported and logged any work not meeting Spec requirements
  • Recorded all data in QCS database

AT A GLANCE

Project Type Government
TITAN Role Quality Control (QC) Manager
Client Great Lakes Dredge & Dock
Completion Date February 2016
Contract Price $5M