Maintenance Dredging – Philadelphia, PA

W912BU-15-C-0048

BRIEF DESCRIPTION

This project involves removing 127,000 c.y of soft sandy material along a portion of the Delaware River between Philadelphia, PA to Trenton, NJ. Logistics consisted of removing the material with a clamshell dredge, transporting the material down river, and unloading the material at a nearby unloading site.

TITAN performed quality control management services. In addition, TITAN handled reviewing, scheduling, certifying and managing the submittals through the 3-Phase process of inspection.

SCOPE OF WORK

  • Procedures for tracking preparatory, initial, and follow-up control phases; control, verification, and acceptance tests including documentation
  • Coordination of project logistics, materials and equipment
  • Managing the day-to-day quality control activities Overseeing safety aspects of the job
  • Kept designated personnel and management staff apprised of status of work
  • Ensured all reports were prepared and submitted in accordance with the QC Plan, including the Daily Quality Control Report and through the QCS/RMS system
  • Maintained all the project quality control files Reported and logged any work not meeting Spec requirements
  • Recorded all data in QCS database

AT A GLANCE

Project Type Government
TITAN Role Quality Control (QC) Manager
Client Great Lakes Dredge & Dock
Completion Date February 2016
Project Size 127,000 CY
Contract Value $5M