AIWW Maintenance – Wilmington, NC (Contract 1)

W912EP-19-D-0044

Titan, Consultants and Engineers, LLC

BRIEF DESCRIPTION

Removal of shoaled material that has accumulated in the channels since the various areas were last dredged. Dredging depth is 12’ required depth plus 2’ of allowable overdepth for the AIWW channels. The total estimated quantity of material to be dredged is 355,000 cubic yards.

AT A GLANCE

TITAN Role Quality Control (QC) Manager & Site Safety & Health Officer (SSHO)
Client Southwind Construction Corp.